(02) 8021 3517 Send your job →
● FORSPEC standard detail · Pile caps and lift pits · Joints and waterstops

Lift pit base to strip footing construction joint waterproofing detail (BGL011): reinforcement through stop-end

Revision
B
Issued
11/11/2026
Sheet
A3 · NTS
Files
PDF · DXF

The DXF opens in AutoCAD, Revit, BricsCAD and DraftSight; DWG on request. Standard detail, not to scale: read it with the FORSPEC specification, the current data sheets and the project drawings.

On this sheet

  • Section A–ALongitudinal section through strip footing at lift pit base
  • View B–BElevation on CJ face: board removed
  • Detail CTypical bar crossing CJ: enlarged

More pile caps and lift pits details

All 33 details →
● Not the detail you need?

Send us your job. We draw it.

Send the drawings, photos or a description. FORSPEC comes back with a project-specific version of BGL011 for your job.

FORSPEC drawing sheet, full screen
100% PDFDXF
Send us your job →☎