Building · Waterproofing · ConcreteIssue 01 · November 2026
Waterproofing and building news. For Australian trades.
The FORSPEC Brief01Nov 2026Screeds on balconies
● This month's newsletter
The FORSPEC Brief, issue 01
November 2026 · 11 stories. Read it here, or get issue 02 by email.
● Series
Rules that clash on site
Two rule books, two answers, one job. A numbered series on where the codes and standards disagree and what to build.
- 1:100 or 1:80? The two fall rules in every bathroomWet areas
- 35, 40 or 50 mm? Three figures for a floating screedTiling & screeds
- Shower walls: junctions, or the whole wall?Wet areas
- "8% moisture": the most misread numberConcrete
- The 28-day rule that is not in any standardConcrete
- How high should a balcony upturn be?Building code
- A tile trim is not a waterstopWet areas
- Class III and C2 S1 are not the same kind of ratingTiling & screeds
- Basements: the job no Australian Standard coversBuilding code
- Flood testing: what the standards sayWet areas
Building code
All 4 →Wet areas
All 5 →Plumbing and drainage
All 3 →Concrete and moisture
All 4 →Tiling and screeds
All 3 →Products and testing
All 5 →On site
All 11 →Past issues
The FORSPEC Brief02Dec 2026Out Tue 1 DecThe FORSPEC Brief01Nov 2026Screeds on balconies
Every issue and sign-up →
● The FORSPEC Brief · monthly
The month in waterproofing. In one email.
Code and standards changes, new products, new test reports and jobs from site. Once a month. No sales emails.
Use it on the job
● Your job next
Got a job on the go?
Send the drawings or a few photos. FORSPEC comes back with the system, the details and the products for your job, within 6 business hours.




▶ 3.2K
▶ 6.7K











