(02) 8021 3517 Send your job →
● Wet areas

Shower wall waterproofing. Junctions, or the whole wall?

1 min readFORSPEC Technical Team

The short version

  • On its own, AS 3740 asks for the shower wall junctions to be waterproof and the wall faces to be water resistant.
  • The NCC asks for the whole shower wall face to be waterproof to at least 1800 mm.
  • Both apply. Waterproof the whole wall.

This is the most common gap between what a waterproofer was taught and what a certifier looks for. Both are reading a real rule. They are reading different documents.

What each document asks for

AS 3740, wall junctions
Waterproof to 1800 mm above the floor, or 50 mm above the shower rose if that is higher
AS 3740, wall faces
Water resistant
NCC, shower wall faces
Waterproof to at least 1800 mm

The NCC lets you use AS 3740 for how the work is done. It does not let AS 3740 reduce where the waterproofing has to go. The code's own list of what is waterproof applies on both paths, for houses and for apartments.

On site

Where this comes from

Standards are summarised in FORSPEC's own words as a guide. Read the standard itself and your project documents before you build.

Email thisNewsletter

Systems, products and drawings

● Your job next

Got a job this applies to?

Send the drawings or a few photos. FORSPEC comes back with the system, the details and the products for your job, within 6 business hours.

On site with FORSPEC

@forspec.pc on Instagram →

More news

All news →
● The FORSPEC Brief · monthly

The month in waterproofing. In one email.

Code and standards changes, new products, new test reports and jobs from site. Once a month. No sales emails.

One email a month. Unsubscribe in one click. We never share your address.

Send us your job →☎