(02) 8021 3517 Send your job →
● System 08 of 12 · Leak repair

Waterproofing Over Tiles: Leak Repair

A clear coating over existing tiles and grout that stops a leaking balcony or shower without lifting a tile. The tiles must be firmly fixed and the grout sound.

No tile removalLeak fixed for up to 5 years
5products
0CAD details
Up to 5 yrleak fix, from the data sheetleak fix
3D drawing: leak repair over existing tiles, clear coating over the tiles and grout
● The build-up

Four products, in the order of the job.

Each layer with the one figure that matters, from its data sheet. Tap a layer to see why it is there.

01ACTFLEX HYDROPLUGStops a live leakACTFLEX HYDROPLUGSets in 2 to 4 minutes

Rapid-setting plug pressed into a chase cut square, at least 20 x 20 mm, never a V. Final set is within 10 minutes. A 5 kg pail does about 6 m of chase.

02ACTFLEX MS PROSeal the junctionsACTFLEX MS PROTack-free in 15 minutes

Seals perimeter junctions and around penetrations before the coating. 600 mL sausage, curing about 2 mm a day.

03ACTFLEX 75FCPolyurethane sealantACTFLEX 75FC600 mL sausage · 3.5 mm cure in 24 h

Polyurethane joint sealant for movement joints and junctions.

04ACTFLEX 400 CLEARClear coating over the tilesACTFLEX 400 CLEAR3 thin coats · 1 kg ≈ 3 m²

Single-pack clear coating with no primer. 0.2 mm dry over the tiles and 0.5 mm over grout and joins. At least 4 hours between coats, all coats within 48 hours. Keep water off for 3 to 5 days; full cure takes 5 to 7.

How much do I need?ACTFLEX 400 CLEAR: 1 kg covers about 3 m², 3 kg about 9 m² and 7 kg about 21 m², over three coats.
Calculate →
● Every product in this system

Leak repair: 5 products.

TDS and SDS open straight from the card.

ACTFLEX 400 CLEAR

ACTFLEX 400 CLEAR

No Tile Removal

  • No Tile Removal
  • Up To 5 Years Leak Fix
  • Clear Semi-Gloss
ACTFLEX MS PRO

ACTFLEX MS PRO

Primerless Adhesion

  • Primerless Adhesion
  • Non-Staining
  • Isocyanate-Free
ACTFLEX 75FC

ACTFLEX 75FC

Fast Moisture Cure

  • Fast Moisture Cure
  • Non-Sag Gun Grade
  • High Recovery
ACTFLEX HYDROPLUG

ACTFLEX HYDROPLUG

Stops Active Leaks

  • Stops Active Leaks
  • Hand-Sets in 2–4 Minutes
  • Non-Shrink
ACTFLEX CRACK SWELL PU1100

ACTFLEX CRACK SWELL PU1100

Self-Expanding

  • Self-Expanding
  • Dual Cartridge Delivery
  • Low Viscosity
● 3D models

See every layer before site starts.

Each FORSPEC detail is modelled in 3D so the site team sees the build-up for leaking balcony & shower repair before anyone opens a pail. Send the job and we model yours.

3D model: Wet area build-up
Wet area build-upShower, floor and bath · every layer
3D model: Pile cap tanking
Pile cap tankingSheet membrane dressed around the pile head
3D model: Planter box
Planter boxMembrane, drainage cell and outlet
● On site

Real jobs. Real FORSPEC.

Tiled terrace sealed with ACTFLEX 400 CLEAR
Tiled terrace sealed with ACTFLEX 400 CLEAR
Your job next

Got a job like this coming up?

Send the drawings or a few photos. A FORSPEC rep comes back with the system, the CAD details and a 3D of your job.

Send us your job →
● Questions we get

Straight answers, from the TDS.

Can you waterproof over existing tiles?

ACTFLEX 400 CLEAR goes over existing tiles in three thin coats, with no primer. The tiles must be firmly fixed and the grout sound: it does not fix broken or loose tiles, loose grout or cracks.

How long does the repair last?

The ACTFLEX 400 CLEAR data sheet states the leak is fixed for up to 5 years.

How much 400 CLEAR do I need?

1 kg covers about 3 m², 3 kg about 9 m² and 7 kg about 21 m², over three coats.

How long before the shower or balcony can be used?

Keep water off for 3 to 5 days after the last coat. Full cure takes 5 to 7 days.

How long between coats?

At least 4 hours, with all three coats on within 48 hours. Apply above 10°C.

● Go deeper

Drawings, data sheets, jobs and news.

● The other systems

Twelve systems. One warranty.

● Not sure it suits the job?

Send us the job. We spec it.

Drawings, photos or a description. A FORSPEC rep comes back with the system, the spec clause, CAD details and a 3D visual within 6 business hours.

Send us your job →☎