(02) 8021 3517 Send your job →
● Wet areas

Bathroom floor falls. 1:100 or 1:80?

2 min readFORSPEC Technical Team

The short version

  • AS 3740: at least 1:100 in the floor under the membrane where a floor waste is required, and at least 1:80 on the finished shower floor.
  • The NCC: any floor with a floor waste falls between 1:80 and 1:50.
  • Both apply on the same job. Build to the stricter figure and check the finished floor.
FORSPEC drawing of a bathroom floor section: substrate under the membrane falling 1:100 or more, finished shower floor falling 1:80 or more, finished floor between 1:80 and 1:50
Three fall figures, three layers of the same floor.

Ask three trades what fall a bathroom floor needs and you will hear three numbers. Each of them is in a rule book. They apply to different layers of the same floor.

The three numbers

Under the membrane (AS 3740)
1:100 or more, where a floor waste is required
Finished shower floor (AS 3740)
1:80 or more
Any floor with a floor waste (NCC)
Between 1:80 and 1:50

Building to AS 3740 does not switch off the NCC figure. For houses, and for apartments and commercial buildings, the code's own fall rule sits on top of the standard.

How they fit together

The NCC does not say whether its fall is measured on the finished tiles or on the floor underneath. FORSPEC reads it this way, and it satisfies both documents:

Where no fall is needed

A bathroom floor with no floor waste outside an enclosed shower needs no fall under AS 3740, as long as the shower is enclosed and water stays in the room. Once a floor waste is installed, the fall rules apply.

On site

  1. Find out before the screed: is there a floor waste, and is the membrane above or below the screed?
  2. Set the fall in the floor the membrane will sit on.
  3. Check the finished floor with a level before the tiler leaves. Water should run to the waste and none should sit.

Where this comes from

Standards are summarised in FORSPEC's own words as a guide. Read the standard itself and your project documents before you build.

Email thisNewsletter

Systems, products and drawings

● Your job next

Got a job this applies to?

Send the drawings or a few photos. FORSPEC comes back with the system, the details and the products for your job, within 6 business hours.

On site with FORSPEC

@forspec.pc on Instagram →

More news

All news →
● The FORSPEC Brief · monthly

The month in waterproofing. In one email.

Code and standards changes, new products, new test reports and jobs from site. Once a month. No sales emails.

One email a month. Unsubscribe in one click. We never share your address.

Send us your job →☎