● FORSPEC News · topic
On site. Jobs, methods, training.
What is going in on site: lift pits, basements, pools, bathrooms and joints, with the method and the figures from the data sheet.
11 stories so far
Two concrete tanks wrapped in ACTFLEX 5000On site··1 min read
A lift pit lined with PREFLEX 3000 before the pourOn site··1 min read
The membrane under the screed, on every floorOn site··1 min read
A pool detailed the right way in ACTFLEX 988 CWPOn site··1 min read
Every pipe detail welded into the sheetOn site··1 min readA bathroom floor ready to tile in an hourOn site··1 min readA concrete pool in ACTFLEX 988 CWPOn site··1 min readThe waterproofing practical is full; so is 17 NovemberOn site··1 min readACTFLEX 5000 under a secondary slabOn site··1 min readPREFLEX 3000 before the basement slab pourOn site··1 min read
Movement joints: how a joint is sealedOn site··1 min read● The FORSPEC Brief · monthly
The month in waterproofing. In one email.
Code and standards changes, new products, new test reports and jobs from site. Once a month. No sales emails.
Use it on the job
● Your job next
Got a job on the go?
Send the drawings or a few photos. FORSPEC comes back with the system, the details and the products for your job, within 6 business hours.