Basement slab waterproofing. Laid before the pour.

1 min readFORSPEC Technical Team

The short version

  • PREFLEX 3000 was laid before the basement slab was poured.
  • The wet concrete bonds to the sand-finished face of the sheet, so water cannot track between the two.
  • It needs no primer and no torch.

Under a basement slab there is no second chance. A pre-applied membrane is laid first, and the slab that is poured over it becomes part of the waterproofing.

The figures

Thickness
1.7 mm: 1.5 mm HDPE plus a 0.2 mm sand finish
Which way up
Sand face up, toward the concrete
Upturn
300 to 400 mm
Pour within
56 days of laying
Primer
None

On this job the sheet was detailed around the pile caps and taken up to the wall and floor terminations. Pile heads are sealed before the pour, as in the lift pit story.

FORSPEC on Instagram · 1 Nov 2026PREFLEX 3000 before a basement slab pourLoads when you tap

Where this comes from

Email thisNewsletter

Systems, products and drawings

● Your job next

Got a job this applies to?

Send the drawings or a few photos. FORSPEC comes back with the system, the details and the products for your job, within 6 business hours.

On site with FORSPEC

@forspec.pc on Instagram →

More news

All news →
● The FORSPEC Brief · monthly

The month in waterproofing. In one email.

Code and standards changes, new products, new test reports and jobs from site. Once a month. No sales emails.

One email a month. Unsubscribe in one click. We never share your address.

Send us your job →☎