(02) 8021 3517 Send your job →
PREFLEX 3000 pack
● TDS-PREFLEX-3000 · Rev 3 · 22 August 2026

PREFLEX 3000 Pre-applied sheet

Pre-applied, fully bonded HDPE waterproofing membrane

Pre-applied HDPE sheet for below-ground structures. Concrete cast against it bonds to it.

1.7 mm thickPour within 56 daysNo primer
1.7 mmThickness
1 m x 20 mRoll size
Class IIIClass
1273%Elongation
12.83 MPaTensile
288.73 N/25 mmSeam strength
● Explainer

How PREFLEX 3000 goes on

● The numbers

PREFLEX 3000 sizes and key figures

Pre-applied HDPE membrane laid before the concrete is poured, for basement slabs, retaining walls, lift pits and tunnels. It needs no primer, torch or power tools and can go over permanent formwork.

Thickness
1.7 mmtypical1.5 mm HDPE base plus 0.2 mm sand finish · TDS p3
Roll size
1 m x 20 m20 m² gross; 2 m x 20 m (40 m²) also available · TDS p6
Class
Class IIItypicalhigh extensibility, typical lab value · TDS p3
Elongation
1273%typicalat break, AS 1145.3 · TDS p3
Tensile
12.83 MPatypicalAS 1145.3 · TDS p3
Seam strength
288.73 N/25 mmtypicalfield seam, AMTM 005 · TDS p3
Pour within
56 days42 days if above 38°C for over seven days running · TDS p7
Floor upturn
300–400 mmcontinuous, kept visible for the wall return · TDS p6
Shelf life
36 monthsfrom manufacture, stored at 10–25°C · TDS p9

From the FORSPEC data sheet, TDS-PREFLEX-3000 · Revision 3 · 22 August 2026. Times are at 25°C and 50% relative humidity unless the data sheet says otherwise. Typical = FORSPEC’s own typical value, not a laboratory-certified one.

● Real jobs

PREFLEX 3000 on site

Laying it under the slab
Lap and tape detail
Below the water table, Sans Souci

More FORSPEC jobs

● Is it right for the job

Where PREFLEX 3000 is used

Use it for

  • Basement slabs and below-ground floor structures
  • Blindside and back-of-wall on reinforced concrete retaining walls
  • Lift pits and plant pits
  • Cut-and-cover tunnels and subway structures
  • Pile caps and capping beams, with FORSPEC system components
  • Below-ground structures with a permanently inaccessible outer face

Know before you start

  • Pre-applied only: concrete must be cast directly against it, not a post-applied membrane
  • Not for permanently exposed use: protect from prolonged UV and pour within the window
  • No screws, nails or washers through field sheets or adhesive lap zones
  • Not over unresolved water ingress: stop active water with ACTFLEX HYDROPLUG first
● On site

How to apply PREFLEX 3000

  1. 01

    Accept substrate

    Sound, stable, clean, free of standing water and sharp protrusions, with falls so groundwater cannot pool. Blinding at least 20 MPa. The supervisor signs the substrate record first.

  2. 02

    Cracks and coves

    Rectify live cracks first. Dry junctions get a FORBUILD 100 cove on ACTFLEX 300 Primer, protected 48 hours. Use ACTFLEX HYDROPLUG for active water. No primer on the membrane.

  3. 03

    Lay the floor

    Sand-finished face up toward the future concrete. Close side laps on the selvedge and end laps over concealed NS Tape. Pressure roll from the centre out. Upturn 300–400 mm.

  4. 04

    Walls and details

    Wall sheets go on only after the floor, upturns and penetrations are accepted. Use S Tape for exposed terminations and NS Tape for concealed laps.

  5. 05

    Pile caps

    ACTFLEX 988 CWP in three coats to 1.5 mm total dry film, and ACTFLEX HBR at 3 mm. Overlap the membrane onto HBR by at least 50 mm and terminate with S Tape.

  6. 06

    Pre-pour release

    Remove liners, repair defects and expose every sand-finished face. Supervisor signs the pre-pour checklist. Pour within 56 days of installation.

A short guide from the data sheet. Read the full PREFLEX 3000 TDS before you start.

● Calculator

How many rolls of PREFLEX 3000 do I need?

Pre-applied sheet under slabs and blindside walls, 20 m² roll

What are you tanking? (floor turns 400 mm up)
Laps and waste

Roll 1 m × 20 m = 20 m² gross. Net cover depends on the side and end laps in your approved detail, plus cutting at grade beams, pile caps and pipes, so 20% is added by default. The floor turns 400 mm up every wall (TDS: 300 to 400 mm). Tapes are an allowance, not a TDS rate: NS Tape for end laps, S Tape for exposed terminations, base corners and repairs.

You need

0 rolls

 

Where the figures come from

Roll 1 m × 20 m = 20 m² gross. Net cover depends on the side and end laps in your approved detail, plus cutting at grade beams, pile caps and pipes, so 20% is added by default. The floor turns 400 mm up every wall (TDS: 300 to 400 mm). Tapes are an allowance, not a TDS rate: NS Tape for end laps, S Tape for exposed terminations, base corners and repairs.

  • Roll size, standard: 1 m × 20 m, 20 m² gross. TDS-PREFLEX-3000, R3, 22 Aug 2026, page 6
  • Net coverage per roll: gross area less the project's side and end laps (no fixed figure). TDS-PREFLEX-3000, R3, 22 Aug 2026, page 6
  • Floor upturn at walls: 300 to 400 mm (400 used). TDS-PREFLEX-3000, R3, 22 Aug 2026, page 6

More: PREFLEX 3000 product page · Below ground system

All calculators →

Learn to install it

Hands-on FORSPEC training that covers PREFLEX 3000.

Where it has been used

FORSPEC projects built with PREFLEX 3000.

Drawings for the systems it goes in

FORSPEC standard details as PDF and DXF. Each sheet is a generic detail: the specification names the products.

● Proof

PREFLEX 3000 test reports and compliance

AS 4654.1-2012
Class III, durability and cyclic movement satisfied (typical values)ISO/IEC 17025 lab testing, report being reissued
AS ISO 13007.5
No visible penetration; 0.04 g mass gain (typical)App. A.7
Below-ground
No Australian Standard governs pre-applied membranesStated per FORSPEC policy
Safety Data Sheet
Current SDS issuedChemwatch 5689-17

Download the reports

Results as stated in the data sheet, TDS-PREFLEX-3000 · Revision 3 · 22 August 2026. Warranty up to 25 years, depending on the system: ask FORSPEC which term applies to your system.

● Questions

PREFLEX 3000 questions

Which way up does PREFLEX 3000 go?

The sand-finished face must face the future concrete, with the HDPE backing against the substrate or support. A reversed sheet prevents the bond and lets water move sideways. Check it at every fold and wall return.

Do I need a primer?

No. Do not prime the membrane or the substrate under it. Priming applies only to ancillary products, such as ACTFLEX 300 Primer under FORBUILD 100 coves.

How long can I leave it before pouring?

Pour within 56 days of installation, or within 42 days where the temperature is above 38°C for more than seven consecutive days. It is not for permanent exposure.

What is the difference between S Tape and NS Tape?

NS Tape is double-sided, for concealed laps and detailing under the next sheet. S Tape has a sand-finished top for exposed terminations, edge sealing and repairs. NS Tape must never stay exposed to fresh concrete.

How do I repair damage?

Damage 12 mm or smaller: S Tape centred over it. Larger damage: a PREFLEX 3000 patch extending at least 150 mm past the damage in every direction, on NS Tape, sealed with S Tape.

How much do I need?

Rolls are 1 m x 20 m (20 m²) or 2 m x 20 m (40 m²) gross. Net coverage depends on the lap widths in the approved project detail and on cutting waste. Work it out from the detail before ordering.

● Documents

PREFLEX 3000 TDS and SDS

Always work from the current data sheet. Every FORSPEC TDS and SDS →

Specify it. Or buy it.

Send the drawings or photos and FORSPEC comes back with the system, the details and the quantities. Or find a FORSPEC stockist for PREFLEX 3000.

Send us your job →☎