Lift pit waterproofing project PREFLEX 3000
A lift pit lined with PREFLEX 3000 before the concrete goes in: the floor, the walls and every pile head.
- System
- Below ground
- Product
- PREFLEX 3000
What was built
- PREFLEX 3000 sheet membrane laid over the pit floor and up the formwork walls, before the steel and the pour.
- Every pile head detailed where the starter bars come through the membrane.
- The wall to floor junction closed off all the way round.
The result. The pit is tanked from the outside before the pour, so the new concrete is cast straight onto the membrane.