(02) 8021 3517 Send your job →
● Project · Below ground

Under slab waterproofing, Pymble PREFLEX 3000 project

PREFLEX 3000 laid across a basement floor at Pymble before the slab is poured. The membrane goes down first and the concrete goes on top.

Where
Pymble NSW
System
Below ground
Product
PREFLEX 3000

What was built

  • PREFLEX 3000 sheet membrane over the whole basement floor, before the slab pour.
  • Pits and set-downs lined in the same sheet.

The result. The membrane is down and ready for steel and concrete.

System and products used

More projects

All projects →
Send us your job →☎