Screed calculator
Enter the area and the depth, pick the build-up, and the screed calculator gives you the bags. SCREED X comes pre-blended in 20 kg bags; FORCEM SCREED BINDER is mixed with your own sand. Every figure is from the FORSPEC data sheets.
How many bags of SCREED X do I need?
Pre-blended screed, 20 kg bag
The sum uses 18 kg per m² for every 10 mm, the top of the data sheet's 16 to 18 kg range, so one 20 kg bag covers about 1.11 m² at 10 mm. The data sheet's typical yield is 1.15 to 1.20 m² a bag; the calculator works to the heavier figure so you do not run short. Minimums: bonded 10 mm; unbonded 40 mm, or 35 mm (the Unbonded button) only over a cured, flood-tested FORSPEC membrane with mesh reinforcement and a double 200-micron slip sheet; floating 45 mm.
You need
0 bags
An estimate from the data sheet figures. Check it before you order.
Where the figures come from
The sum uses 18 kg per m² for every 10 mm, the top of the data sheet's 16 to 18 kg range, so one 20 kg bag covers about 1.11 m² at 10 mm. The data sheet's typical yield is 1.15 to 1.20 m² a bag; the calculator works to the heavier figure so you do not run short. Minimums: bonded 10 mm; unbonded 40 mm, or 35 mm (the Unbonded button) only over a cured, flood-tested FORSPEC membrane with mesh reinforcement and a double 200-micron slip sheet; floating 45 mm.
- Consumption: about 16 to 18 kg per m² per 10 mm (18 used). TDS-SCREEDX, R3, 12 Nov 2026, page 2
- Yield per 20 kg bag: about 11.5 to 12.0 L compacted; 1.15 to 1.20 m² at 10 mm. TDS-SCREEDX, R3, 12 Nov 2026, page 2
- Minimum thickness: bonded 10 mm; unbonded 40 mm, engineered 35 mm over FORSPEC membranes; floating 45 mm. TDS-SCREEDX, R3, 12 Nov 2026, page 3
- Unbonded over a FORSPEC membrane: 35 mm, only over cured, flood-tested FORSPEC membranes with mesh reinforcement and a double 200-micron slip sheet. TDS-SCREEDX, R3, 12 Nov 2026, page 3
- Pack: 20 kg bag; 50-bag pallet. TDS-SCREEDX, R3, 12 Nov 2026, page 2
More: SCREED X product page · Balconies & podiums system · Screeds & levelling system
How much FORCEM and sand do I need?
Screed binder you mix with sand, 20 kg bag
One standard batch (20 kg FORCEM + 100 kg sand) makes about 61 L compacted, or 6.1 m² at 10 mm. The 1 : 4 batch makes about 51 L. Water is the dry-sand figure per batch; the enhanced mix swaps 2 L of it for ACTFLEX 300. Theoretical yield, before falls, compaction and site losses.
You need
0 bags
An estimate from the data sheet figures. Check it before you order.
Where the figures come from
One standard batch (20 kg FORCEM + 100 kg sand) makes about 61 L compacted, or 6.1 m² at 10 mm. The 1 : 4 batch makes about 51 L. Water is the dry-sand figure per batch; the enhanced mix swaps 2 L of it for ACTFLEX 300. Theoretical yield, before falls, compaction and site losses.
- Yield per 20 kg bag, standard 1:5: about 61 L; 6.1 m² at 10 mm. TDS-FORCEM, R3, 12 Nov 2026, page 3
- Yield per 20 kg bag, reduced 1:4: about 51 L; 5.1 m² at 10 mm. TDS-FORCEM, R3, 12 Nov 2026, page 3
- Sand and water per batch, 1:5 (dry sand): 100 kg, 8.5 to 9.0 L. TDS-FORCEM, R3, 12 Nov 2026, page 2
- Sand and water per batch, 1:4 (dry sand): 80 kg, 7.0 to 7.2 L. TDS-FORCEM, R3, 12 Nov 2026, page 3
- Enhanced mix: 2 L of ACTFLEX 300 per 20 kg FORCEM and 100 kg sand, deducted from the water. TDS-FORCEM, R3, 12 Nov 2026, page 3
- Minimum thickness, bonded and unbonded: bonded 10 mm; unbonded 40 mm. TDS-FORCEM, R3, 12 Nov 2026, page 4
- Minimum thickness, floating: 55 mm. TDS-FORCEM, R3, 12 Nov 2026, page 5
More: FORCEM SCREED BINDER product page · Screeds & levelling system
How much screed do I need?
How many bags of screed do I need?
Multiply the area by the thickness. SCREED X uses about 16 to 18 kg per m² for every 10 mm, so the calculator allows 18 kg (one bag about 1.11 m² at 10 mm): 20 m² at 40 mm with 5% waste is 76 bags of 20 kg. With FORCEM SCREED BINDER one batch of 20 kg of binder and 100 kg of sand makes about 61 litres of compacted screed.
What is the minimum screed thickness?
SCREED X: 10 mm bonded and 45 mm floating. Unbonded it is 40 mm, or 35 mm only over a cured, flood-tested FORSPEC membrane with mesh reinforcement and a double 200-micron slip sheet; the calculator's Unbonded button uses that 35 mm. FORCEM SCREED BINDER: 10 mm bonded, 40 mm unbonded and 55 mm floating. Pick the build-up in the calculator and the depth goes up to the minimum it shows.
SCREED X or FORCEM SCREED BINDER?
SCREED X comes pre-blended in 20 kg bags. FORCEM SCREED BINDER is mixed with your own dry sand: 100 kg of sand to each 20 kg bag at 1:5 makes about 61 litres of compacted screed, or about 6.1 m² at 10 mm.
Can FORSPEC check my quantities?
Yes. Send us your job with the drawings and FORSPEC replies within 6 business hours with the system, the quantities and the details for it.
More: all 92 calculators · FIBRE X dose calculator · screeds and levelling · SCREED X · FORCEM SCREED BINDER · FIBRE X
Send us your job. We check the numbers.
Send the drawings and FORSPEC sends back the screed build-up, the quantities and the details for it.